The site acceptance test checklist Diaries
Initiate the boot-up approach for engineering and operator workstations According to the maker’s Directions.Once the site continues to be cleaned and all fixtures are mounted, an inside box tension and air flow check is executed. This test is conducted making sure that the House is correctly pressurized and There may be sufficient ventilation.Pow